- Home
- Community
- 2017 Bond Initiatives
- Roads, Drains, Infrastructure
Roads, Drains, Infrastructure
| 2018-04 South Murphy Road Right Turn Lane at FM544 | ||
|---|---|---|
| 50.119 | South Murphy Road Right Turn Lane at FM544 | View |
| 2020-01 S. Maxwell Creek Road, Kinney Dr. and Bunny Run Rehabilitation and Drainage Improvements | ||
|---|---|---|
| 50.101 | D-5 South Maxwell Creek Road (36" Culvert) | View |
| 50.103 | D-7 South Maxwell Creek Road (72" Culvert) | View |
| 50.104 | D-8 South Maxwell Creek Road (2 - 48" Culvert) | View |
| 50.102 | D-6 Bunny Run Drive (2 - 48" Culvert) | View |
| 50.114 | South Maxwell Creek Road | View |
| 50.115 | Kinney Drive | View |
| 2020-04 Lonesome Dove Trail Drainage Culvert Extensions | ||
|---|---|---|
| 50.09 | D-1 (6-Foot by 6-Foot Reinforced Concrete Box Culvert Extension) | View |
| 50.91 | D-2 (18-Inch Reinforced Concrete Pipe Culvert) | View |
| 50.92 | D-3 (60-Inch Reinforced Concrete Pipe Culverts) | View |
| 50.93 | D-4 (60-Inch Reinforced Concrete Pipe Culverts) | View |