2020-04 Lonesome Dove Trail Drainage Culvert Extension

Overall Percent Complete

5%

2020-04Timeline

Status: Completed bond issuance / sale in December 2019 for future construction funding. Completed surveys for design incorporation.

50.90 D-1      Reinforced Concrete Box Culvert Extension:

Installation of drainage pipe to fill in the area of bar ditches to Maxwell Creek providing for the reduction of perpetual maintenance and more access to open space for the community.

50.91 D-2      Reinforced Concrete Pipe Culvert:

Installation of drainage pipe to fill in the area of bar ditches to Maxwell Creek providing for the reduction of perpetual maintenance and more access to open space for the community.

50.92 D-3       Reinforced Concrete Pipe Culverts:

Installation of drainage pipe to fill in the area of bar ditches to Maxwell Creek providing for the reduction of perpetual maintenance and more access to open space for the community.

50.92 D-4      Reinforced Concrete Pipe Culverts:

Installation of drainage pipe to fill in the area of bar ditches to Maxwell Creek providing for the reduction of perpetual maintenance and more access to open space for the community.

Area Impacted:

Lonesome Dove Trail