2020-03 Timbers Addition Drainage Channel Improvements

Engineering Progress

10%


Engineering Phase2020-03Timeline

Construction Phase
2020-03B2Timeline

50.80 C-1 East of Shady Timbers Lane:

1260 linear feet X 50 foot channel repair east of Shady Timbers Lane; add of maintenance access; does not meet drainage design standards

50.81 C-2 South Murphy Rd. to Hawthorne Drive:

1080 linear feet X 50 foot channel repair from South Murphy Road to Hawthorne Drive; add of maintenance access; does not meet drainage design standards

50.82 C-3 South Murphy Rd. to Mimosa Drive:

2480 linear feet X 50 foot channel repair from South Murphy Road to Mimosa Drive; add of maintenance access; does not meet drainage design standards; culverts under Hawthorne Drive are settling compromising street pavement

Area Impacted:

Timbers Addition